Learning Center
Downloads
Tags
- 3D Digital Models 6
- 3d scanners 1
- AI in Construction 1
- AMG 1
- Artificial Intelligence 1
- As-Built 1
- Autocad 2
- Base and Rover 1
- Better meetings 1
- Big Data 2
- Big Data in Construction 3
- CAD 5
- CAD files 4
- Cad Services 1
- Changes in Construction 2
- Civil GPS systems 4
- Communication 2
- Conexpo 1
- Construction Data and Safety 3
- Construction Project Bidding 6
- Construction Takeoffs 6
- Construction control site networks 2
- Construction planning 1
- Construction projects 6
- Control Points 3
- Curbs 1
- DEM 1
- DSM 1
- DTM 4
- Dig safe 1
- Digital takeoffs 6
- Drone data 2
- Drones 2
- Earthwork drones 1
- Electronic Distance Measuring 1
- Ellipsoids 1
- Excavation Safety 1
- Excavation bidding process 3
- Excavation hybrid fleet 1
- GPS Machine Calibration 3
- GPS equipment software 4
- GPS/GNSS 8
- Geoids 2
- Heavy Equipment GPS 6
- Lidar 2
- Milling and Paving 1
- Milling and Paving Technologies 1
- Orthophotos 2
- Point Cloud 1
- RTK 3
THE VALUE OF AS-BUILTS FOR WATER LINES
The main purpose of an as-built drawing is to record any changes made during the building process that deviate from the original plan. As-builts are useful for many reasons, one being the value they bring to water lines which in our opinion are some of the most troublesome proposed utilities on a job site.
HOW TO BEST ACCOUNT FOR CHANGES IN YOUR BIDDING PROCESS
Over the years, we have come across different reasons for suboptimal bids. The most common reasons are all related to, you can probably guess it, changes! Many changes occur throughout a project's lifecycle. Sometimes they start as early as the bid phase. Changes to the project's scope that happen pre-bid are usually referred to as addendums. A few of these pre-bid changes come to mind.
Videos

Consideration When Buying a Drone

What Happens When You Start Working with ECI

How ECI Gives Your In-house GPS a Boost

How Much Does A Road Model Cost?