Learning Center
Downloads
Tags
- 3D Digital Models 6
- 3d scanners 1
- AI in Construction 1
- AMG 1
- Artificial Intelligence 1
- As-Built 1
- Autocad 2
- Base and Rover 1
- Better meetings 1
- Big Data 2
- Big Data in Construction 3
- CAD 5
- CAD files 4
- Cad Services 1
- Changes in Construction 2
- Civil GPS systems 4
- Communication 2
- Conexpo 1
- Construction Data and Safety 3
- Construction Project Bidding 6
- Construction Takeoffs 6
- Construction control site networks 2
- Construction planning 1
- Construction projects 6
- Control Points 3
- Curbs 1
- DEM 1
- DSM 1
- DTM 4
- Dig safe 1
- Digital takeoffs 6
- Drone data 2
- Drones 2
- Earthwork drones 1
- Electronic Distance Measuring 1
- Ellipsoids 1
- Excavation Safety 1
- Excavation bidding process 3
- Excavation hybrid fleet 1
- GPS Machine Calibration 3
- GPS equipment software 4
- GPS/GNSS 8
- Geoids 2
- Heavy Equipment GPS 6
- Lidar 2
- Milling and Paving 1
- Milling and Paving Technologies 1
- Orthophotos 2
- Point Cloud 1
- RTK 3
YOUR COORDINATE SYSTEMS IN AUTOCAD DON’T ALIGN, NOW WHAT? READ ON…
Today, most projects have coordinate systems because of CAD design. Often, the coordinate systems being used differ between what the architect uses versus what the civil engineers use versus what the structural engineers use versus what the surveyors use. As a result of the different systems, the measurement units differ, and the plans don't align.
POINT CLOUD TO TAKEOFF SOFTWARE: YOUR KEY TO SUCCESS
There have been many advances in the technologies used for creating precise maps for use in earthwork projects. However, have you struggled with getting your point cloud into your takeoff software? You are not alone!
GPS MACHINE CONTROL: WHAT’S THE DIFFERENCE BETWEEN ALL THE FILE TYPES?
Depending on which brand of GPS equipment you’re using the file types and therefore file extensions will differ. The reason for this is that the brands each have their proprietary systems with their own file types as opposed to universal ones. For example, have you received files ending in .ttm, .dxf, .csv, .tn3, .ln3, or others and wondered what’s the difference between them?
PROJECT TURNAROUND: PROBLEMS THAT AFFECT SPEED AND HOW TO AVOID THEM
A question we are frequently asked by our clients and prospective clients is “What is the turnaround time for this project?”. Generally speaking, we typically run on average with a two-week turnaround time but situations sometimes impact that timeline which means it could take longer. Let’s go over some problems that impact the speed of model building.
Videos

Consideration When Buying a Drone

What Happens When You Start Working with ECI

How ECI Gives Your In-house GPS a Boost

How Much Does A Road Model Cost?